Farmingdale State College
Architectural Design II
ARC 257: Project 2

Analysis & Design of Adding on
For this project, we were tasked with designing an expansion to the Smith House, originally designed by Richard Meier. A key requirement was to carefully analyze the existing systems and patterns of the house and incorporate them into the new design to preserve its original architectural integrity.
Throughout the process, we used conceptual analogies along with a clear overarching idea and narrative to guide the design. This approach allowed us to respond to the needs of the new owners while remaining consistent with the original structure. At the same time, the addition introduces new systems and patterns that build on, rather than replicate, those already present in the house.
Narrative
The addition emphasizes health, movement, and shared experiences within the home. Designed for an owner with a strong interest in fitness and wellness, it introduces spaces that support both physical activity and everyday living, while maintaining a balance between active and restorative environments.
The home gym serves as the central and most important space in the design. It encourages daily movement and healthy routines while remaining visually and spatially connected to the rest of the home. Natural light and open circulation help create a sense of energy and openness, making the gym feel integrated rather than separate.
Supporting spaces such as the living room provide areas for relaxation and recovery, creating a contrast to the more active zones. Together, these elements demonstrate how architecture can promote well-being by combining movement, comfort, and social interaction into one cohesive design.
Hierarchy:
Meta Idea:
Exercise Room
Circles
Public:
Gym
Deck
Family room
Private:
Master bedroom
Master bathroom
Loud:
Gym
Deck
Family room
Quite:
Master bedroom
Master bathroom
Group:
Deck
Family room
Individual:
Master bedroom
Master bathroom
Gym

Contextual Analysis
Existing Floor Plans

Existing Building Systems and Patterns
Vise Grip
Tea Leaf Ball Strainer
Eyelash Curler

Final Floor Plans



Lower Level Floor Plan
Entry Level Floor Plan
UPPER PATIO
LIVING ROOM
OPEN TO BELOW
OPEN TO GYM
BEDROOM
CLO.
BATH
BATH
MASTER BEDROOM
CLO.
Upper Level Floor Plan
BEDROOM
BEDROOM
BATH
BEDROOM
OFFICE
OPEN TO LIVING ROOM
LOWER PATIO
DINING ROOM
BEDROOM
BATH
KITCHEN
EXERCISE ROOM
FAMILY ROOM
New Floor Plan Analysis

H
H
V
V
V
V
V
Circulation
Horizontal
Vertical

Structure
Girder
Bearing Wall
Column

Public / Private
Public
Private

Additive / Subtractive
Additive
Subtractive

Hierarchy

Open / Close
Open
Close
Preliminary Designs

Preliminary Design 1

Preliminary Design 2

Preliminary Design 3
Existing Systems brought into the new addition



Half Wall
Column & Girder
Railing
Curtain Wall
Final Elevations

Front Elevation

Left Elevation

Back Elevation

Right Elevation
Final Sections


3D Section



Videos
Renders




